All categories
| Customer RFQ | Request for quotation with product drawings, samples or just concept. |
| Quotation | Issue quotation within 3 days |
| Project kicks off upon receipt of deposit | |
| Layout Assembly Drawing | 3 to 7 days for layout drawings |
| Detailed Design | Mold components with detail drawings. |
| Drawing Final Confirmation | Drawings are finally confirmed by customer |
| Schedule | Follow up the schedule |
| Mould Manufacture | Mould manufacture on schedule |
| Mould Trial Running and Samples Submitted |
Mould trial running on schedule, and Samples are submitted with a detailed inspection report |
| Sample Confirmation | After inspected final samples according to specifications customer make a confirmation. |
| Packing | tooling finished and packed |
| Delivery | Paperwork and a CD of assembly drawings are sent to customer at the time of the shipment of the mould. |
No. 505, Building 2#, COFCO Business Park, the 2nd Liuxian Road, BaoAn District, Shenzhen 518051, China
+86-755-86182820
+86-755-86182592
+86-13923718807
info@ada-mould.com
Contact Us
© Copyright 2024. ADA Mould All rights reserved.


