Customer RFQ
Request for quotation with product drawings, samples or just concept.
-
Quotation
Issue quotation within 3 days
-
Order Confirmation
Project kicks off upon receipt of deposit
-
Layout Assembly Drawing
3 to 7 days for layout drawings
-
Detailed Design
Mold components with detail drawings.
-
Drawings Final Confirmation
Drawings are finally confirmed by customer
-
Schedule
Follow up the schedule
-
Mould Manufacture
Mould manufacture on schedule
-
Mould Trial Running and Samples Submitted
Mould trial running on schedule, and Samples are submitted with a detailed inspection report
-
Sample Confirmation
After inspected final samples according to specifications customer make a confirmation.
-
Packing
tooling finished and packed
-
Delivery
Paperwork and a CD of assembly drawings are sent to customer at the time of the shipment of the mould.