Project Procedure >>
Customer RFQ | Request for quotation with product drawings, samples or just concept. |
Quotation | Issue quotation within 3 days |
Project kicks off upon receipt of deposit | |
Layout Assembly Drawing | 3 to 7 days for layout drawings |
Detailed Design | Mold components with detail drawings. |
Drawing Final Confirmation | Drawings are finally confirmed by customer |
Schedule | Follow up the schedule |
Mould Manufacture | Mould manufacture on schedule |
Mould Trial Running and Samples Submitted |
Mould trial running on schedule, and Samples are submitted with a detailed inspection report |
Sample Confirmation | After inspected final samples according to specifications customer make a confirmation. |
Packing | tooling finished and packed |
Delivery | Paperwork and a CD of assembly drawings are sent to customer at the time of the shipment of the mould. |