Project Procedure >>

Customer RFQ Request for quotation with product drawings, samples or just concept.
Quotation Issue quotation within 3 days
  Project kicks off upon receipt of deposit
Layout Assembly Drawing 3 to 7 days for layout drawings
Detailed Design Mold components with detail drawings.
Drawing Final Confirmation Drawings are finally confirmed by customer
Schedule Follow up the schedule
Mould Manufacture Mould manufacture on schedule
Mould Trial Running and Samples
Submitted
Mould trial running on schedule, and Samples are submitted with a detailed inspection report
Sample Confirmation After inspected final samples according to specifications customer make a confirmation.
Packing tooling finished and packed
Delivery Paperwork and a CD of assembly drawings are sent to customer at the time of the shipment of the mould.